Want to know what we can do for you

Bathroom Refurbishment

This was a major refurbishment of a bathroom with having multiple trades working together to create a new larger shower room.

Once we made a start ripping everything out we soon discovered how bad the floor was. We also needed room for waste pipes. So we had a long discussion with the client and we decided to level the whole floor up but this would make a small step going into the new shower room. It is a small price to pay to have the perfect room.

The ceiling was covered with shower panels and new spot lights fitted. The shower area had shower panels with the rest of the walls tiled half way up. The toilet and sink were fitted into vanity units and also cupboard space to fit the room.

The floor was TLC flooring which is a vinyl tile in wood plank effect which looks very realistic but with out the hassle of real wood in a wet area.

DATE

May 14th, 2018

CLIENT

Paul Callaghan, Stainmore

PROJECT TYPE

Domestic

CONTRACTOR

C & L Services

D J Taylor Plumbing & Heating

Ian Webb